
Tailored projects for every energy need.
STUDIES & FUNDING
Energy efficiency feasibility study
The Altanergy team conducted a detailed energy efficiency feasibility study for the Bombardier Challenger plant in Montreal. The initial objective was to submit a grant application for this study by verifying if any grants had been awarded in the past. Subsequently, data collection included energy consumption bills and plant plans, accompanied by a site visit to assess the electromechanical systems in detail.
An energy consumption analysis was carried out based on the bills, followed by the development of measures to reduce energy consumption and greenhouse gas (GHG) emissions. Techno-economic calculations helped identify potential grants through TEQ, Énergir, Hydro-Québec, and the Écoleader program. Finally, a detailed feasibility report was prepared, outlining the proposed measures for the entire site.